Yanez Painting
503-314-8896

CCB#214896


Day 1 - June 15th, 2020 (half day afternoon)
Power washing the whole house.























Day 2 - Rainy Day
We are matching the paint - DURATION Sherwin-Williams
The next day I could not tell the new paint, it means it matches 100 percent.

























Day 3 - the most activities throughout the day





























Covering the outside lights


























Meet Israel Yanez - the boss (EL JEFE)


























The white trims are covered, they will do brush painting later


























The wood fence is protected, so no green paint gets in the wood


























Another details protection



























Meet Jose, he makes sure to cover the driveway really well



























Meet Luis


























The house is ready to be painted - the light green (Primary color scheme)

























This is the back house (kitchen)


























Jose is ready to paint the gutters





























Applying "primer" to the new wood being replaced






























We added the fence to be stained as well.
Sprayed and then using the roller to finish it.


























Luis is painting the window trims by brush




























I removed the house numbering earlier on,
I use BRASSO to buff them to its original stage.




























End of day three.




























Day 4 (half day early morning)

The front door is being prepped and painted.
Jose and Luis are doing the touch ups around the house.
We did a walk through - everything looks good.




























A new "kick plate" is being installed.




A job well done!
Thanks to Israel, Jose and Luis (Santa Claus)



(c) yongkieandpokie
MMXX
06192020