Bathroom Remodeling
and New Carpeting
Start date 6/2/2025 - End date 8/4/2025
Before
The bedroom becomes a staging area
Day 1
Day 2
Draven and Arthur
End of Day 2
Now, unrecognizable
40 inches high to the top
46 inches from the wall
For Future Grab Bar
I learned something new - NAIL PLATE or STUD GUARD PLATE
End of Day four (wrong location)
Correct location (with light) and the exhaust fan is closer to the opening of
the shower
A hole in the wall
A hole on the floor
Gift from the plumber Brad
A gift from the plumber #2 by Brad
Jared - apprentice
Floor patch by Draven
Electrical by Igor and Steven
End of week two
Insulation by Kris and Chewy - about an hour
Third week - Day 1
This is Jesse
Jorge has left for the day
Fixing the wall of living room
Jorge is back for texturing the bathroom
There are four areas that need to be fixed and re-textured
We got texture. End of week 3
Shower niche - 45 inches from floor - 12x15
Handle bar/grab bar
31.5 inches from the wall
Electrical outlet for Future Bidet
Joel is back today for priming the wall,
after the bathroom.
Beginning of week four 6/24/2025
The cabinets arrived - June 25th
That's Arthur
Underlayment, cabinets installed 6/25
Cabinet Installation by Draven 6/25
End of day 6/25
We need a new house, nothing is straight!
Alex is doing the tile - 50 percent
The tile guy is Alex (from Moldova)
The bathroom niche - height 45 inch from floor
Alex will be here all next week
Cameron is making a template for the counter top,
Tristen is fixing the tile joint in the kitchen
End of week 4
Looking at the best pattern possible, beginning of week 5
That one!
Here's Alex
The bathroom is not as dark as we imagine after tiles are installed
The bench
Almost complete, next is GROUT
End of fifth week!
Our office
In preparation of carpeting
Tristen is doing his magic!
This is where the "cut" of the quartz.
Beginning of week six
July 8th
Eric is finishing up.....
We have floor - July 9th
We can open and close the window, thanks to Draven!
July 10th
Finally we can paint the window frame!
Arthur did the window
To show the window trim
Doors are done for the cabinets,
Draven works on it
Finally, we can close the door properly
End of week 6
July 11th, 2025
Beginning of week 7
July 14th
Draven has to come back to do his magic!
July 15th
Main Lights, Timer, Shower Light, Small Light
Week 8th, 07/21/2025
By Noe
Manny is doing the finish plumbing
It takes 3 people to change a light bulb
- removing the old light bulb
catching the old light bulb
- one is supervising the "project"
Draven is installing the 'hardware"
July 24th
There is always something.......missing (door pull)
Defective manufacturing
WHOALLA...
Matthew, Scott Weaver, DJ
The glass Shower door is installed
Self Portrait
(c) yongkieandpokie
MMXXV
06032025