Bathroom Remodeling
and New Carpeting
Start date 6/2/2025 - End date 8/4/2025

Before
























































The bedroom becomes a staging area



























Day 1




























Day 2

Draven and Arthur


























End of Day 2




























Now, unrecognizable




























40 inches high to the top



























46 inches from the wall
For Future Grab Bar



























I learned something new - NAIL PLATE or STUD GUARD PLATE



























End of Day four (wrong location)








Correct location (with light) and the exhaust fan is closer to the opening of the shower



























A hole in the wall



























A hole on the floor



























Gift from the plumber Brad




























A gift from the plumber #2 by Brad
Jared - apprentice




























Floor patch by Draven


























Electrical by Igor and Steven























































End of week two
Insulation by Kris and Chewy - about an hour


























Third week - Day 1




























This is Jesse
Jorge has left for the day


























Fixing the wall of living room




























Jorge is back for texturing the bathroom




























There are four areas that need to be fixed and re-textured




























We got texture. End of week 3

























Shower niche - 45 inches from floor - 12x15





























Handle bar/grab bar
31.5 inches from the wall

























Electrical outlet for Future Bidet


























Joel is back today for priming the wall,
after the bathroom.



























Beginning of week four 6/24/2025
























The cabinets arrived - June 25th





























That's Arthur



























































Underlayment, cabinets installed 6/25


























Cabinet Installation by Draven 6/25

























































End of day 6/25



























We need a new house, nothing is straight!


























Alex is doing the tile - 50 percent


























The tile guy is Alex (from Moldova)



























The bathroom niche - height 45 inch from floor


























Alex will be here all next week





























Cameron is making a template for the counter top,
Tristen is fixing the tile joint in the kitchen
End of week 4



























Looking at the best pattern possible, beginning of week 5




























That one!


























Here's Alex



























The bathroom is not as dark as we imagine after tiles are installed


























The bench




























Almost complete, next is GROUT

 
























End of fifth week!





























Our office




























In preparation of carpeting



























Tristen is doing his magic!



























This is where the "cut" of the quartz.
Beginning of week six


























July 8th




























Eric is finishing up.....



























We have floor - July 9th



























We can open and close the window, thanks to Draven!
July 10th

























Finally we can paint the window frame!
Arthur did the window




























To show the window trim




























Doors are done for the cabinets,
Draven works on it




























Finally, we can close the door properly
End of week 6
July 11th, 2025
























Beginning of week 7
July 14th


























Draven has to come back to do his magic!
July 15th


























Main Lights, Timer, Shower Light, Small Light
Week 8th, 07/21/2025
By Noe

























Manny is doing the finish plumbing




























It takes 3 people to change a light bulb
- removing the old light bulb
catching the old light bulb
- one is supervising the "project"




























Draven is installing the 'hardware"




























July 24th

 

























There is always something.......missing (door pull)
Defective manufacturing



























WHOALLA...


























Matthew, Scott Weaver, DJ




























The glass Shower door is installed




























Self Portrait





(c) yongkieandpokie
MMXXV